Cytra
Inspired Gaming

Key Facts

Location Bridgend, South Wales

Duration 1 week

Completion January 2023

Services Provided Fire-stopping, remedial sealing works

Building Type Factory and office

Sector Commercial

HIGHLIGHT

We worked closely with the building management team to phase the works to minimise disruption.

Project overview

Assist PFP was appointed to carry out a full fire-stopping and compartmentation upgrade due to a canteen move and remedial fire stopping measured in the warehouse. The project required extensive remedial works to bring the property into line with the latest fire safety standards, all completed while the building remained fully operational.


The challenge

A recent fire risk assessment had identified multiple areas of non-compliance, including poorly sealed service penetrations and damaged fire barriers. The building’s tenants needed to remain in place during the works, so the project required careful planning to minimise disruption while maintaining a safe environment. Live factory site, although the canteen area was stripped out and accessible. Height – scaffolding tower was required and the fire curtains needed stitching in situ. Removal of floor boards to fills gaps under the floor.


Our solution

Assist PFP carried out a detailed fire-stopping survey to map all compartment lines and identify defects. Our technicians then installed Batt and mastic work, and a high fire curtain install in two phases. We worked closely with the building management team to phase the works to minimise disruption.

Results

  • Full compliance achieved

  • Zero disruption to building operations

  • Positive feedback from both occupants and management